Unit 14: Operations Scheduling




          Self Assessment                                                                       Notes

          Fill in the blanks:
          13.  The  major advantage  of reservation  systems  is  the ………………,  they give  service
               managers to plan the efficient use of facilities.
          14.  ……………… techniques have been developed to enhance demand for services as well as
               minimize the negative impacts of reservation systems.
          15.  ……………… can be flexed by buying additional inexpensive plant, recruiting unskilled
               or semiskilled staff, or sub-contracting, or of course short term overtime.

          14.6 Summary


              Scheduling is the problem of assigning a set of tasks to a set of resources subject to a set of
               constraints.
              Capacity has two basic types of constraints—a hard ceiling and a soft ceiling.
              Sequencing is basically an order in which the jobs, waiting before an operational facility,
               are processed.
              A shop load is approved from the most heavily loaded work center to the slightest loaded.
              An index method is a heuristic technique of loading, which would yield better results than
               the simple and intuitive method.
              Gantt chart is a visual tool that takes two basic forms—the job or activity progress chart
               and the machine chart. Both types of Gantt charts present the ideal and the actual use of
               resources over time.
              The Gantt chart takes two basic forms which are The job or activity progress chart and The
               machine chart.
              A schedule obtained by sequencing jobs in increasing order of processing times is called
               a shortest processing time (SPT) rule.
              Where demand is known in advance or can be forecast, a way to manage capacity is to
               schedule customers for arrival times and definite periods of service time.

          14.7 Keywords

          Gantt Chart: It is a visual tool that takes two basic forms—the job or activity progress chart and
          the machine chart. Both types of Gantt charts present the ideal and the actual use of resources
          over time.
          Hard Ceilings: It is for capacity are limits that make the capacity extremely difficult to flex.
          Scheduling: It is the problem of assigning a set of tasks to a set of resources subject to a set of
          constraints.

          Sequencing: It is basically an order in which the jobs, waiting before an operational facility, are
          processed.
          Soft Ceilings: It is for capacity are limits that make the capacity reasonably easy to flex.

          14.8 Review Questions

          1.   The main components of a planning and scheduling model require that you define the
               variables. What would it include?