Page 152 - DCOM303_DMGT504_OPERATION_RESEARCH
P. 152

Unit 7: Assignment Problem – Balanced




          Step 2: Calculation-wise reduction of the matrix.                                     Notes
                Jobs                      A            B           C           D
              Contractors     1           0            4           4           5
                              2           4            0           0           0
                              3           2            0           6           0
                              4           0            7           9           7

          Step 3: Applying Hungarian approach.
                Jobs                      A            B           C           D
              Contractors     1            0           4           4           5
                              2            4           0           0           0
                              3            2           0           6           0
                              4            0           7           9           7

          Step 4: Trial assignment.

                Jobs                      A           B            C           D
             Contractors     1            0           0            0           1
                             2            8           0            0           0
                             3            6           0            6           0
                             4            0           3            5           2

          Step 5: Calculation of total minimum cost.
                      Job                   Contractors             Total Cost (Rs.)
                       A                        4                        09
                       B                        3                        20
                       C                        1                        30
                       D                        2                        12
                                                                         71

          Inference
          Therefore, the total minimum cost required to complete the assignment, i.e., 4 jobs by 4 contractors
          is ` 71 (i.e., ` 71,00,000).



             Did u know?  An assignment problem can be solved by the following four methods:
             1.  Enumeration Method
             2.  Simplex Method
             3.  Transportation Method

             4.  Hungarian Method










                                           LOVELY PROFESSIONAL UNIVERSITY                                   147
   147   148   149   150   151   152   153   154   155   156   157