Page 144 - DCAP304_DCAP515_SOFTWARE_PROJECT_MANAGEMENT
P. 144

Software Project Management




                    Notes             MK II for analysis and measurement of information processing applications based on end
                                       user functional view of the system.

                                      Constructive  Cost Model  is  static  single-variable  model.  Barry Boehm  introduced
                                       COCOMO models.

                                   6.9 Keywords

                                   COCOMO: Constructive Cost Model

                                   EI: External Inputs
                                   EIF's: External Interface Files
                                   EO: External Outputs
                                   EQ: External Inquiry
                                   IFPUG: International Function Point User Group

                                   ILF's: Internal Logical Files
                                   PERT: Program Evaluation and Review Technique
                                   PROBE: Proxy Based Estimation

                                   6.10 Review Questions


                                   1.  How Inaccurate Estimates lead to Failed Projects?
                                   2.  A sound estimate starts with a work breakdown structure (WBS). Explain.
                                   3.  An inaccurate estimate leads to infeasible plans. Discuss.
                                   4.  Project work estimation has three phases, explain each in detail.
                                   5.  Give characteristic of Quality Function Point Analysis.

                                   6.  Function Point Analysis was developed first by Allan J. Albrecht in the mid 1970s. Discuss.
                                   7.  For selecting an estimation technique, what are the factors need to be considered? Explain
                                   8.  The MK II (Mark 2) Method is one of the software sizing methods in functional point
                                       group of measurements. Analyze.
                                   9.  Examine how Constructive Cost Model (COCOMO) is a method for assessing the cost of a
                                       software package?

                                   10.  Explain what are the Strong and Weak Points and possible Remedial Measures of a model?

                                   Answers: Self  Assessment

                                   1.  Thumb                             2.   Estimates
                                   3.  Team                              4.   Roadblocks
                                   5.  Sound                             6.   Inaccurate

                                   7.  PL/PM                             8.   Estimate
                                   9.  Beginning                         10.  Structured
                                   11.  Functionality                    12.  function points




          138                               LOVELY PROFESSIONAL UNIVERSITY
   139   140   141   142   143   144   145   146   147   148   149