Page 230 - DMGT206_PRODUCTION_AND_OPERATIONS_MANAGEMENT
P. 230

Unit 11: Facility Planning and Layout




          4.   Simplified scheduling of materials and labour,                                   Notes
          5.   Quicker set-ups and fewer tooling changes, and
          6.   Improved functional and visual control.
          Disadvantages include the following:

              Reduced manufacturing flexibility.
              Unless the forecasting system in place is extremely accurate, it also has the potential to
               increase machine downtime (since machines are dedicated to cells and may not be used all
               the time).
              There is also the risk that the Cells that may become out-of-date as products and processes
               change, and the disruption and cost of changing to cells can be significant.
              There  is  increased  operator  responsibility,  and  therefore  behavioural  aspects  of
               management become crucial.

          Self Assessment


          Fill in the blanks:
          12.  Group layout is suitable when a large variety of products are needed in …………….volumes.
          13.  In the Cellular Layout, the machines are grouped in a ……………… .

          11.7 Application in Service Industry and Comparison of Layouts

          Services  establishments for instance motels,  hotels, restaurants,  must give due attention to
          client convenience, quality  of service, efficiency in  delivering services and gratifying  office
          ambience.   In today’s  environment, the  clients look  for  easiness  in approaching  different
          departments of a service organization and therefore the layout should be designed in a fashion,
          which  allows clients  quick and  convenient access  to  the  facilities  presented  by  a  service
          establishment.
          At any airport, it is common to see baggage in the arrival area being distributed using U-shaped
          conveyor  belts.  There  is a  trend to  move from  traditional  longitudinal  assembly lines  to
          U-shaped assembly lines, especially in Cellular Layouts. Not only is it useful particularly when
          there is a single worker in the line taking care of all the workstations, but it also consumes less
          space. The U shape of the line cuts the walking distance of the worker by almost half.
          Assembly line balances frequently result in unequal workstation times. Flexible line layouts,
          such as the U-shaped line with work sharing, could help resolve the imbalance and are a common
          way of dealing with this problem. The closeness of the workstations, is used by the Japanese, to
          allow workers to help a fellow worker catch up, thus increasing teamwork among workers.
          Plant layout  is as well applicable to five star hotels as well.  Here  lodging, bar, restaurant,
          kitchen, stores, swimming pool, laundry, shaving saloons, shopping arcades, conference hall,
          parking areas etc. should all find an appropriate place in the layout.  Here significance must be
          given to cleanliness, elegant appearance, convenience and compact looks, which magnetize
          customers.



             Did u know? Plant layout is applicable to a cinema hall, where emphasis is on comfort, and
             convenience of the cinemagoers. The projector, screen, sound box, fire fighting equipment,
             ambience etc. should be of greatest importance.



                                           LOVELY PROFESSIONAL UNIVERSITY                                   225
   225   226   227   228   229   230   231   232   233   234   235