Page 41 - DCOM303_DMGT504_OPERATION_RESEARCH
P. 41

Operations Research




                    Notes          Step 5: Substitute the co-ordinates of the corner points in the objective.
                                                   Minimise ‘Z’ = 2,500x  + 3,000x
                                                                    1       2
                                                        At ‘A’, Z =                    2,500(70) + 3,000(0) = 1,75,000
                                                        At ‘B’, Z =                   2,500(20) + 3,000(25) = 1,25,000

                                                        At ‘C’, Z =                 2,500(10) + 3,000(33.33) = 1,24,990
                                                        At ‘D’, Z =                    2,500(0) + 3,000 (50) = 1,50,000

                                   Inference

                                   Thus, the rubber company can minimize its total cost to  ` 1,24,990 by producing 10 units of
                                   product in plant 1 and 33.33 units in plant 2.

                                   2.8 Cases of Mixed Constraints



                                        Example: A firm that makes products x and y has a total production capacity of 9 tonnes per
                                   day, x and y  requiring the same production capacity.  The firm  has a  permanent contract to
                                   supply at least 2 tonnes of x and 3 tonnes of y per day to another company. Each one of x requires
                                   20 machine  hrs. Production time and y requires 50 machine hrs production time. The daily
                                   maximum possible number of machine hours available is 360. All the firm’s output can be sold,
                                   and the profit set is ` 80 per tonne of x and ` 120 per tonne of y. You are required to determine
                                   the production schedule to maximize the firm’s profit.

                                   Solution:
                                   Let  x  be the no. of tonnes of product ‘X’
                                        1
                                       x  be the no. tonnes of product ‘Y’
                                        2
                                   Hence, the objective function is given by,

                                   Maximize                ‘Z’ = 80x  + 120x                (Subject to constraints)
                                                                  1     2
                                                    20x  + 50x   360                     (Machine hour constraint)
                                                       1    2
                                                           x   2
                                                            1
                                                           x   3                              (Supply constraints)
                                                            2
                                                        x  + x   9                         (Production constraint)
                                                         1  2
                                                         x , x   0                     (Non-negativity constraint)
                                                          1  2
                                   Step 1: Find the divisibles of the equalities.
                                               Equation                   x1                     x2
                                              20x 1 + 50x 2 = 360         18                    7.2
                                                  x1 + x2  = 9            9                      9
                                                      x 1 = 2             2                      0
                                                      x2 = 3              0                      3

                                   Step 2: Fix up the graphic scale
                                               Minimum points = 2
                                               Maximum points = 18
                                                         1 cm. = 2 points