Unit 7: Assignment Problem – Balanced




          7.   A company has 4 machines on which do 3 jobs. Each job can be assigned to one and only  Notes
               one machine. The cost of each job on each machine is given in the following table:

                                                    Machine
                Job             A                B             C             D

                 1              18              24            28             32
                 2               8              13            17             19
                 3              10              15            19             22

               Determine the optimum assignment.
          8.   Solve.
               (a)

                Jobs                                 Men
                                A                B             C             D
                 I               1               4             6              3
                 II              9               7            10              9
                 III             4               5            11              7
                 IV              8               7             8              5

               (b)
                Jobs                                 Men
                                A                B             C             D
                 I              10              25            15             20
                 II             15              30             5             15
                III             35              20            12             24
                IV              17              25            24             20

          9.   A machine tool company decides to make 4 sub-assemblies through four contractors. Each
               contractor is to receive only one sub-assembly. The cost of each sub-assembly is determined
               by the bids submitted by each contractor and is shown in table below (in '000 `). Assign
               different assemblies to contractors so as minimize the total cost:
                  Sub-assembly                          Contractor
                                        A           B            C            D
                       I               15          13           14            17
                      II               11          12           15            13
                      III              18          12           10            11
                      IV               15          17           14            16