Page 49 - DMGT525_MATERIALS_MANAGEMENT
P. 49

Materials Management




                    Notes          4.4 Purchase Parameters – Eight Rs of Purchasing

                                   Scientific Purchasing is not a mere procurement of needed materials at the lowest price but
                                   procuring them in a way that minimizes the overall cost of the product. To ensure this, scientific
                                   purchasing is governed by eight well  known parameters called Basic  elements of  scientific
                                   purchasing or also called Principles of purchasing or “simply’ 8Rs buying”-Right Quality, Right
                                   Quantity, Right Price, Right Time, Right Source, Right Place of Delivery, Right Procedure and
                                   Right Contract.

                                   1.  Right  Quality:  Quality  of  a  product  is measured  in  terms  of  its design,  chemical
                                       composition, heart treatment, surface treatment, manufacturing process, mechanical and
                                       electrical properties, workmanship, etc. Two distinct but closely inter related aspects of
                                       quality are quality of design or quality of conformance.

                                       Quality of design for purchased items refers to the quality specified by the company’s
                                       design department in the form of specifications while quality of conformance refers to the
                                       extent to which the goods and services purchased compiles with the specification laid
                                       down.
                                       To determine the quality of conformance of purchased items, sampling plans are used.
                                       Different methods of providing quality specifications are – brand or trade name, commercial
                                       standard, performance standard, blue print, samples, etc.

                                                             Figure 4.1: 8Rs of Purchasing

                                                                                    1. Right Quality  Rejections
                                           8. Right contracts   Right Material value
                                                                                        and Specifications
                                               Legal aspects  analysis standardization


                                            7. Right Procedure




                                       6. Right Transportation                          2. Right Quantity EOQ
                                           cost Analysis of       Right attitude            inventory Models
                                           transportation &       8R’s of Purchase

                                           Logistics              Parameters

                                                                                    3. Right Price Negotiation
                                        5. Right Source          4. Right Time          learning curve

                                            Vendor rating            Re-order point

                                            Purchase Research        Lead time


                                   Source: R. Punitha (2008). "Materials Management". Excel Books Pvt. Ltd.
                                   2.  Right Quantity: Right quantity is yet another important parameter in buying. Quantity
                                       decision is influenced by “Relationship methods” and “Buying methods”. Replenishment
                                       method such as reorder level, “two-bin system”, “review system-optional replenishment”,
                                       and “review system compulsory replenishment” help to provide broad guide lines.


                                          Example: Order quantity under first three replenishment system is fixed and is generally
                                   the economic order quantity, yet the same might have been modified in the light of constraints.
                                   However, the  reorder  quantity  under  the  fourth  system  (i.e.  review  period-compulsory




          44                                LOVELY PROFESSIONAL UNIVERSITY
   44   45   46   47   48   49   50   51   52   53   54