                    Notes          4.6.1  Defining the Layout Problem

                                   The layout-planning  problem for  assembly lines  is to  determine the  minimum number  of
                                   stations (workers) and assign tasks to each station, so that a desired level of output is achieved.
                                   The design must consider the following aspects:
                                   1.  It should focus on achieving a desired level of output capacity.
                                   2.  The tasks assigned to stations and the sequence in which tasks must be carried out.
                                   3.  The output should be attained efficiently, without using minimum input resources.

                                                       Table 4.3:  Assembly Line  for Contact  Breaker

                                              Preceding                                    Task
                                      Work                                  Predecessor   Time/Unit   Operators
                                      Station   Work       Task Assigned       Task                 per station
                                               Station                                    (Hours)
                                                        A: Contact Breaker
                                                        Assembly; Take
                                      1       -                            None        0.010        1
                                                        Molding Half and clean
                                                        burrs etc.
                                                        B: Install contacts
                                                                           A           0.020
                                                        C: Install Springs
                                      2       1                            B           0.020        2
                                                        D: Install plastic levers
                                                                           A,C         0.040
                                                        etc. on Molding Half.
                                                        E: Install contacts
                                                                           A           0.020
                                                        F: Install Springs
                                      3       1                            B           0.020        2
                                                        G: Install plastic levers   A,C   0.040
                                                        etc., on Molding Half.
                                                        H: Close with other   G
                                      4       2,3                                      0.050        2
                                                        Molding Half
                                                        I: Assemble 4 of the   H       0.008
                                      5       4                                                     1
                                                        above units
                                      6       5         J: Insert Rivets    I          0.040        1
                                                        K: Rivet the sandwich
                                      7       6                            J           0.098        1
                                                        units
                                                        L: Switching Test under
                                      8       7                            E           0.050        1
                                                        load
                                                        M: Pack Contact
                                      9       8                            F           0.020        1
                                                        Breaker unit
                                              Total                                    0. 354

                                   How this is achieved can be best understood with an example. ABC Electricals is a medium-
                                   sized firm in Delhi. It has an established design of a contact breaker assembly, used industry-
                                   wide to protect all electrical circuits. The company has established an assembly line to manufacture
                                   the product.

                                   The operator starts the assembly process with a molding half. Into this molding he puts the
                                   contacts, springs, plastic levers, etc. The assembly is closed off with a similar molding half. The
                                   final assembly, comprised up to four of these units, is secured with four rivets passing through
                                   the sandwich. The assembly is then tested. Testing is a critical operation, as the contact breaker
                                   assembly carries up to 415 volts. If the unit is found acceptable, it is labeled and packed for
                                   dispatch.