Unit 9: Simulation of a PERT Network (I)



            8.   Activity Networks and PERT Charts are typically used to …………… complex projects in  Notes
                 a visual manner.
            9.   Once the Activity (PERT) chart has been completed, the last step is to review and ………………
                 the chart.
            10.  Networks can be connected to other ……………… to work together in completing a task.
            11.  The ……………… is a database model imagine as a flexible way of representing objects
                 and their relationships.
            12.  The first  test was made in 1958, when CPM was applied to the construction of a new
                 ………………

            13.  The Key Concept used by ……………… is that a petite set of activities.
            14.  Activities with ……………… Total float are on the Critical Path.
            15.  The PERT approach is useful, because it can contain the ……………… in event completion
                 times.
            9.9 Review Questions


            1.   CPM/PERT has been rightfully accorded due significance in the literature on Operations
                 Research and Quantitative Analysis.

            2.   Analyze what the major step for drawing the CPM/ PERT network?
            3.   “Performing more critical activities in parallel”. What do you mean’t by this statement?
            4.    Do you think the critical path method considered only logical dependencies between
                 terminal elements?
            5.   All the preceding activities must be completed previous to the project can begin. Is this the
                 rule for analyzing the activity network? Why or why not?

            6.   Activity Network and Project Evaluation and Review Technique, or PERT, charts are a
                 way of documenting and examine the tasks in a project.
            7.   Is it possible to decrease the critical path of a project? How?

            8.   “PERT assumes that the expected length of a project is purely the sum of their separate
                 expected lengths.” Explain.
            9.   Do you think a PERT chart is a tool that ease decision making? If yes then why?

            10.  A network  diagram can  be created  by hand or by using diagram  software. So  which
                 software is used in network diagram?

            Answers: Self  Assessment

            1.   critical path                   2.   Free Float
            3.   PERT chart                      4.   Disruptions
            5.   Scheduling                      6.   Durations
            7.   Variance                        8.   Document
            9.   Analyze                         10.  networks
            11.  network model                   12.  chemical plant
            13.  CPM/PERT                        14.  zero
            15.  variation