Page 174 - DMGT501_OPERATIONS_MANAGEMENT
P. 174

Operations Management




                    Notes          Model Three (ISO: 9003)

                                   Model three applies to  situations where  only the  suppliers’ capabilities  for Inspection and
                                   Testing can be satisfactorily demonstrated.
                                   In this model, only half of the quality system elements of ISO: 9004 are required and at a lower
                                   level of stringency than model two.

                                   Salient Features of ISO: 9000

                                   ISO: 9000 helps in fixing responsibility:
                                   1.  A company  adopting ISO:  9000 series  must identify  and assign responsibility for all
                                       functions that affect quality. The aim of company shall be to achieve, sustain and improve
                                       the reputation for ‘quality’ at competitive prices in the national and International markets.
                                       For achieving this aim,  the responsibility and commitment  to  quality  belongs to  the
                                       management. An executive with necessary authority and ability must be put incharge as
                                       ‘Management  Representative’  (MR)  and  his  job  would  be  to  co-ordinate  so  that
                                       requirements of ISO 1000 are met. He  must accord the buyers’  representatives all the
                                       facilities listed in the contract and allow him reasonable access to the company records
                                       and procedures (Management Responsibility).

                                   2.  The supplier shall establish and  maintain a documented quality  system as a means of
                                       ensuring that product conforms to specified requirements. This shall include:

                                       (a)  The  preparation of documented quality system, procedures  and instructions in
                                            accordance with the requirements of the International Standard.

                                       (b)  The effective implementation of the documented quality system procedures and
                                            instructions (Quality Policy).
                                   3.  The supplier shall establish and maintain procedures for contract review.

                                   4.  The supplier shall establish and maintain procedures to control all documents and dates
                                       that relate to the requirements of this International Standard. These documents shall be
                                       reviewed and approved for adequacy by authorised personnel prior to issue (Documents
                                       & Data Control).

                                   5.  The supplier shall ensure that purchased product conforms to specified requirements.
                                   6.  The supplier  shall  establish  and  maintain  procedures  for  verification,  storage  and
                                       maintenance of purchased supplier product provided for incorporation with the supplies.
                                       (e.g., Rolling-mill for a mini steel plant project).
                                   7.  Where applicable and appropriate, the supplier shall establish and maintain procedures
                                       for identifying the product from applicable drawings, specifications or other documents,
                                       during all stages of production, delivering and installation.

                                       (Identification of Product)
                                   8.  The supplier shall ensure that all processes are carried out under Controlled Conditions.
                                       (Process Control). The supplier shall ensure that:
                                       (a)  The incoming product is not used or processed until the same has been inspected or
                                            otherwise verified (Raw Materials Inspection).






          168                               LOVELY PROFESSIONAL UNIVERSITY
   169   170   171   172   173   174   175   176   177   178   179